JAMB Commerce 1997, Question 25

Commerce1997Transport and Communication
25. The cost that arises from failure to load or unload a ship at the port within a stipulated period is known as
  1. A.excess charges
  2. B.demurrage charges
  3. C.premium charges
  4. D.trade charges.

Answer: B

demurrage charges